Armored Fill Installation (Part 2 of 2)

The remainder of the crossing's fillslope is backfilled with armor of various size classes. Armor size is based on stream power.
The remainder of the crossing's fillslope is backfilled with armor of various size classes. Armor size is based on stream power.
After: Armored fill crossing conveying streamflow shortly after completion of construction
After: Armored fill crossing conveying streamflow shortly after completion of construction
Post-winter: Armored fill crossing 6 months following construction, at the end of the first winter
Post-winter: Armored fill crossing 6 months following construction, at the end of the first winter
© 2024 Pacific Watershed Associates Inc. Contact design & development: accelerant