Pacific Watershed Associates
(707) 839-5130 |
Contact Us
Home
Services
Geological Consulting
Hydrology & Water Quality Monitoring
Erosion Assessments & Watershed Restoration
Erosion & Sediment Control
Road & Trail Planning and Analysis
Coastal Geomorphology and Ecology
Stormwater Management & QSP/QSD Training
Geographic Information Systems (GIS)
Civil, Hydraulic & Environmental Engineering
company
Projects
Featured Project Profiles
Before and After Project Photos
Project Videos
News
Publications
GSA Advantage
search
Home
»
Projects
» Before and After Project Photos
Before and After Project Photos
Sort Photos by Category:
All
Road Decommissioning-Landslide Excavation
Road Upgrading-Stream Crossings
Road Decommissioning-Road Surface
Road Upgrading-Road Shaping and Drainage
Emergency Erosion Control
Road-Decommissioning-Stream Crossings
Outlet Creek Emergency Erosion Control (1 of 3)
Before: Un-permitted hilltop grading for marijuana cultivation has caused erosion and degraded water quality in Outlet Creek.
During: Heavy equipment is used to recontour the hillslope and prevent future sediment delivery to Outlet Creek.
After: The ridgetop has been recontoured, seeded and mulched just in time for the winter wet season.
Tags:
Emergency Erosion Control
Outlet Creek Emergency Erosion Control (2 of 3)
Before: Poorly-designed, un-permitted hilltop grading and road construction discharges sediment to a tributary of Outlet Creek.
After: Implementation of emergency erosion control measures prevents additional sediment delivery and protects water quality.
Tags:
Emergency Erosion Control
Outlet Creek Emergency Erosion Control (3 of 3)
Before: Surface erosion of this unpaved road delivers excessive fine sediment to a tributary of Outlet Creek.
After: Implementation of proper road drainage techniques disipates runoff, dramatically reducing erosion and sediment delivery.
Tags:
Emergency Erosion Control
Tomki Creek Emergency Erosion Control (Part 1 of 3)
Before: Un-permitted, poorly constructed roads and site grading was causing significant erosion - A Clean-up Order was issued
During: Heavy equipment is used to restore the property
After: Decommissioned roads and re-contoured slopes prevent future erosion
Tags:
Emergency Erosion Control
Tomki Creek Emergency Erosion Control (Part 2 of 3)
Before: Un-permitted and poorly constructed roads causing significant erosion and instability
During: Heavy equipment is used to decommission and obliterate the roads. Spoil has been endhauled off-site.
After: All roads have been decommissioned and re-contoured to prevent future erosion
Tags:
Emergency Erosion Control
Tomki Creek Emergency Erosion Control (Part 3 of 3)
Before: Un-permitted grading and modification to the stream network has triggered significant erosion and hillslope instability
During: Heavy equipment and laborers work to restore natural drainage patterns on the property
After: Hillslopes have been re-contoured to restore natural drainage patterns
Tags:
Emergency Erosion Control
Headwaters Forest Bridge Installation (Part 1 of 2)
Before: Undersized culvert on the Headwaters Trail, a former logging road in the Headwaters Forest Reserve
During: The stream crossing is excavated to the natural channel grade, with stable sideslopes. Note one concrete abutment
Tags:
Road Upgrading-Stream Crossings
Headwaters Forest Bridge Installation (Part 2 of 2)
After: The bridge has been installed and the bare sideslopes mulched with straw to control erosion
Two years after: Guard rails have been installed for pedestrians. The site is quickly revegetating with willow and groundcover.
Tags:
Road Upgrading-Stream Crossings
Salmon Creek Stream Crossing Decommissioning (Part 1 of 2)
Before: Looking downstream from near the top of the proposed excavation after the site has been brushed and cleared.
During: The upstream channel had been filled with soil and slash during historic logging. Note stump on left being exhumed.
After: Sideslopes are excavated to match the natural hillslope (see stumps) and unearthed woody debris is spread over bare soil
Tags:
Road-Decommissioning-Stream Crossings
Salmon Creek Stream Crossing Decommissioning (Part 2 of 2)
After: Sideslopes are excavated to match the natural hillslope (see stumps) and unearthed woody debris is spread over bare soil
3 years later: Vegetation is becoming re-established along the restored channel sideslopes
5 years later: Red Alders fix nitrogen, improving soil fertility and setting the stage for future conifer growth
Tags:
Road-Decommissioning-Stream Crossings
1
2
3
4
next ›
last »
© 2024 Pacific Watershed Associates Inc.
Contact
design & development: accelerant