Pacific Watershed Associates
(707) 839-5130 |
Contact Us
Home
Services
Geological Consulting
Hydrology & Water Quality Monitoring
Erosion Assessments & Watershed Restoration
Erosion & Sediment Control
Road & Trail Planning and Analysis
Coastal Geomorphology and Ecology
Stormwater Management & QSP/QSD Training
Geographic Information Systems (GIS)
Civil, Hydraulic & Environmental Engineering
company
Projects
Featured Project Profiles
Before and After Project Photos
Project Videos
News
Publications
GSA Advantage
search
Home
»
Projects
» Before and After Project Photos
Before and After Project Photos
Sort Photos by Category:
All
Road Decommissioning-Landslide Excavation
Road Upgrading-Stream Crossings
Road Decommissioning-Road Surface
Road Upgrading-Road Shaping and Drainage
Emergency Erosion Control
Road-Decommissioning-Stream Crossings
Lacks Creek Stream Crossing Culvert Upgrade (Looking Downstream)(2 of 2)
Before: The culvert at this stream crossing is undersized and poorly alligned with the channel
After: The crossing has been upgraded with a culvert sized for 100-yr peak flows & a critical dip to prevent stream diversion
Tags:
Road Upgrading-Stream Crossings
Hollow Tree Creek Stream Crossing Culvert Upgrade
Before: View of the outlet of an seriously undersized, rusted culvert in need of replacement
After: Properly sized culvert is installed at the base of fill. Rock armor protects the steep outboard fillslope from erosion.
Tags:
Road Upgrading-Stream Crossings
« first
‹ previous
1
2
© 2024 Pacific Watershed Associates Inc.
Contact
design & development: accelerant