Before and After Project Photos

Lacks Creek Stream Crossing Culvert Upgrade (Looking Downstream)(2 of 2)

Before: The culvert at this stream crossing is undersized and poorly alligned with the channel
Before: The culvert at this stream crossing is undersized and poorly alligned with the channel
After: The crossing has been upgraded with a culvert sized for 100-yr peak flows & a critical dip to prevent stream diversion
After: The crossing has been upgraded with a culvert sized for 100-yr peak flows & a critical dip to prevent stream diversion

Hollow Tree Creek Stream Crossing Culvert Upgrade

Before: View of the outlet of an seriously undersized, rusted culvert in need of replacement
Before: View of the outlet of an seriously undersized, rusted culvert in need of replacement
After: Properly sized culvert is installed at the base of fill. Rock armor protects the steep outboard fillslope from erosion.
After: Properly sized culvert is installed at the base of fill. Rock armor protects the steep outboard fillslope from erosion.
© 2024 Pacific Watershed Associates Inc. Contact design & development: accelerant