Tomki Creek Emergency Erosion Control (Part 2 of 3)

Before: Un-permitted and poorly constructed roads causing significant erosion and instability
Before: Un-permitted and poorly constructed roads causing significant erosion and instability
During: Heavy equipment is used to decommission and obliterate the roads. Spoil has been endhauled off-site.
During: Heavy equipment is used to decommission and obliterate the roads. Spoil has been endhauled off-site.
After: All roads have been decommissioned and re-contoured to prevent future erosion
After: All roads have been decommissioned and re-contoured to prevent future erosion
© 2024 Pacific Watershed Associates Inc. Contact design & development: accelerant