Tomki Creek Emergency Erosion Control (Part 1 of 3)

Before: Un-permitted, poorly constructed roads and site grading was causing significant erosion - A Clean-up Order was issued
Before: Un-permitted, poorly constructed roads and site grading was causing significant erosion - A Clean-up Order was issued
During: Heavy equipment is used to restore the property
During: Heavy equipment is used to restore the property
After:  Decommissioned roads and re-contoured slopes prevent future erosion
After: Decommissioned roads and re-contoured slopes prevent future erosion